What we did for a shopfitter
A flagship fit-out where a skip could not go
A shopfitting contractor fitting out a flagship store in the West End could not take a skip. Kerbside restrictions in the Congestion Charge zone and an active retail frontage ruled it out.
We ran Wait and Load cage collections for the length of the job, about 50 of them across 14 months, each booked as the site needed it and often on the same day. They carried mixed fit-out waste, shop-fit furniture and packaging, with plasterboard kept separate. Every load left with a Waste Transfer Note.
The same contractor used the service on two further fit-outs for the same client, one in west London and one in east London. A second fit-out firm used it during three shop builds for one food-to-go brand.
VolumeAbout 50 cage collections
Schedule14 months, booked collection by collection
StreamsMixed fit-out waste, shop-fit furniture, packaging, plasterboard kept separate